Fiber Connectivity Validation

Providing intelligence and analysis for future data center sites.

Why Choose Edgeology

A Three Staged Consulting Approach

We employ a structured, phase-driven approach to data center site evaluation that seamlessly guides clients from initial exploration to full implementation. The methodology integrates technical assessment, infrastructure analysis, and implementation support in a logical progression that ensures thorough evaluation while adapting to each client's unique requirements and timeline. Three phases tailored to your needs that manage costs & timeline.

Technical Assessment

Technical Assessment

Our process begins with Phase 1, a fundamental evaluation of the existing fiber infrastructure surrounding potential data center locations, including the underlying owner, underground and aerial capacity, both lit and dark, and the ability to support a new data center location. Phase one gives you a foundational roadmap.

Infrastructure Analysis

Phase 2 is a more detailed examination of the carriers’ network, manhole splice locations, and a high-level strategic planning approach. Last-mile routing and planning, study of right-of-way (ROW) for preferred routing. ROM costing and deployment approach.

Implementation Support

In Phase 3 we create plans for connectivity from major infrastructure to the data center facility, including route diversity considerations, technology selection, and cost optimization. The developer’s/operators’ strategy will dictate the next steps. This can include writing RFPs, producing engineering drawings, managing construction, and more.

Impact

$7.9 Trillion in Data Center investments by 2030

The capital allocation required to support AI and data center growth over the next decade represents one of the largest infrastructure investment opportunities in modern history, with $5.2 trillion to $7.9 trillion in cumulative global spending projected by 2030.

Fiber infrastructure: $150 billion for fiber-optic cables globally (3 million miles) to support AI workloads.

What We Evaluate

Availability

Capacity

Connectivity

Complexity

Costing

Everyone is chasing power, without power you can’t build the data center, but without fiber connectivity you won’t have any customers.

Get in Touch Today

© 2025 Edgeology. All rights reserved.

Made by Edgeology