Evaluate the Connectivity of your Data Center Site

A three-phase engagement that takes a candidate site from an unknown fiber risk to a fully scoped connectivity plan — before you commit capital or break ground.

Technical Assessment

A foundational evaluation of existing fiber infrastructure around the site.

Route Analysis

A detailed examination of carrier routes, splice locations, and last-mile planning.

Implementation Support

Connectivity plans, RFPs, and construction coordination through to build-out.

PHASE 01

Technical Assessment

A fundamental evaluation of the existing fiber infrastructure surrounding potential data center locations — including the underlying owner, underground and aerial capacity (both lit and dark), and the site's ability to support a new data center. Phase 1 gives you a foundational roadmap before any further commitment.

Preliminary Site Assessment

A first-pass review of the site and its surrounding fiber landscape to flag any immediate red flags before deeper analysis begins.

Infrastructure Identification and Documentation

We identify and document every carrier, conduit, and route within reach of the site — the baseline map everything else builds on.

Ownership and Characteristic Analysis

We determine who actually owns each route and what its physical characteristics are, since "available" fiber and "usable" fiber are not always the same thing.

PHASE 02

Route Analysis

A more detailed examination of carriers' networks, manhole splice locations, and high-level strategic planning — including last-mile routing, right-of-way (ROW) study for preferred routing, and rough order of magnitude (ROM) costing and deployment approach.

Comprehensive Infrastructure Evaluation

A deeper technical review of every viable route, validating and extending what Phase 1 identified.

Connectivity Resource Evaluation

We evaluate available interconnection points, meet-me rooms, and carrier hotels within reach of the site.

Capacity and Growth Assessment

We confirm strand counts and headroom for future buildout phases, not just what's needed on day one.

Last Mile Strategy / Network Ecosystem Mapping

For sites with international or hyperscale requirements, we assess connectivity back to major global routes and exchange points.

Global Connectivity Assessment

For sites with international or hyperscale requirements, we assess connectivity back to major global routes and exchange points.

PHASE 03

Implementation Support

We create plans for connectivity from major infrastructure to the data center facility — including route diversity considerations, technology selection, and cost optimization. Your strategy as developer or operator dictates the next steps, which can include writing RFPs, producing engineering drawings, and managing construction.

Implementation and Integration

We translate the analysis into an actionable connectivity plan aligned with your construction timeline.

Last-Mile Strategy Development

We finalize the last-mile build plan, including engineering drawings and construction coordination.

Carrier Negotiation and RFP Management

We manage the RFP process and carrier negotiations directly, so you get competitive terms without becoming a telecom project manager.

On-Campus Infrastructure Design

We design the on-campus fiber infrastructure to support current and future phases of the build.

"Data center development is complex and requires a great deal of subject matter knowledge and focus. Adam Noll and his team bring decades of fiber engineering expertise combined with an extensive knowledge of data center topologies. My customers rely on Adam and his team to help bring their projects to market quickly and efficiently. "

Dan GoldingDan GoldingChief Technology Officer, ASG

Ready to scope Phase 1?

Book a 30-minute call and we'll review your candidate sites and outline what a Phase 1 assessment would cover for your timeline.

Phase 1

Preliminary Site Assessment

Infrastructure Identification and Documentation ​

Ownership and Characteristic Analysis

Phase 2

Comprehensive Infrastructure Evaluation ​

Connectivity Resource Evaluation

Capacity and Growth Assessment

Last Mile Strategy/Network Ecosystem Mapping

Global Connectivity Assessment

Phase 3

Implementation and Integration

Last-Mile Strategy Development

Carrier Negotiation and RFP Management ​

On-Campus Infrastructure Design

Frequently asked questions

Understand how Edgeology’s services streamline complex infrastructure decisions, align critical dependencies, and accelerate your data center project from concept to execution.

How does Edgeology accelerate early-stage site selection?Edgeology quickly filters potential sites by validating power availability, fiber access, and jurisdictional feasibility upfront. This eliminates unworkable options early and allows teams to focus only on parcels that can realistically support development timelines.

How does Edgeology help reduce delays related to power and utilities?By engaging utilities early and analyzing grid capacity, substation proximity, and interconnection timelines, Edgeology provides a clear view of when power can actually be delivered not just when it’s promised. This prevents projects from stalling due to unexpected utility constraints.

Can Edgeology speed up network and fiber planning?Yes. Edgeology maps existing fiber routes, identifies carrier presence, and designs scalable network strategies early in the process. This ensures connectivity is not an afterthought and avoids costly redesigns or delays later in development.

How does Edgeology improve overall project execution speed?Edgeology aligns critical stakeholders developers, utilities, network providers, and local authorities—early in the lifecycle. By removing uncertainty and coordinating dependencies upfront, projects move from concept to construction faster with fewer disruptions.